PLTD Senayan

Energy and power · Jakarta Pusat · 2021

Project overview

PLTD Senayan in Jakarta Pusat is a MAKEPaint project reference for equipment exposed to high temperatures.

Location
Jakarta Pusat
Sector
Energy and power
Project year
2021
Duration
10 weeks
Area
± 3,000 m²
Surfaces
Hot surfaces
MAKEPaint products
3 products

Project photos

Photos from the project site, by coated surface.

Hot surfaces1 / 4
Coating applicationHot surfaces · 2 / 4
Finished surfaceHot surfaces · 3 / 4
Coat thickness checkHot surfaces · 4 / 4

Challenge, solution and result

The conditions on site, the coating system chosen, and how the work turned out.

Challenge

Stacks, exhausts and hot equipment run at temperatures that make ordinary paint blister and peel.

Solution

MAKE 303 FT zinc silicate primer at 65 µm with a heat-resistant finish for the working temperature: MAKE 200 up to 200°C, MAKE 400 up to 400°C or MAKE 600 up to 600°C.

Result

An area of about 3,000 m² was coated in 10 weeks. The thickness of every coat was checked on site before handover.

Coating system specification

The MAKEPaint products for each surface, from primer to finish, with the dry film thickness the application guide sets.

Coating system specification
ProductDFT
Hot surfacesSurface preparation: SSPC SP 5, 10
PrimerMAKE 303Inorganic Zinc Silicate Primer65 µm
FinishMAKE 200Silicone Acrylic Heat Resisting Finish40 µm
FinishMAKE 400Silicone Heat Resisting Finish30 µm
Total dry film thickness135 µm

Project schedule

The stages of the work by week, from the site survey to handover.

  1. Survey and surface tests

    Week 1

    The technical team checks the surface, the exposure and the area on site.

  2. System recommendation

    Weeks 1–2

    The coating system and colors are agreed, with samples and technical data sheets.

  3. Production and delivery

    Weeks 2–3

    The material is made and shipped from the MAKEPaint plant in Cikarang.

  4. Preparation and application

    Weeks 3–9

    The surface is prepared, then primer, intermediate and finish coats go on.

  5. Inspection and handover

    Week 10

    Coat thickness and adhesion are checked before the work is handed over.

Project video

Coating work on site, from surface preparation to the final coat.

Related documents

Brochures and the catalog for the products used on this project.

Have a similar project?

Tell our team about your surface conditions and requirements.

or email sales@makepaint.co.id