Oil Tank

Oil, gas and storage · Bojonegoro · 2024

Project overview

Oil Tank in Bojonegoro is a MAKEPaint project reference for industrial tanks and vessels.

Location
Bojonegoro
Sector
Oil, gas and storage
Project year
2024
Duration
8 weeks
Area
± 14,000 m²
MAKEPaint products
3 products

Project photos

Photos from the project site, by coated surface.

Tanks and silos1 / 4
Coating applicationTanks and silos · 2 / 4
Finished surfaceTanks and silos · 3 / 4
Coat thickness checkTanks and silos · 4 / 4

Challenge, solution and result

The conditions on site, the coating system chosen, and how the work turned out.

Challenge

A tank lining is in direct contact with what it holds while the outside faces the weather, so the coating must resist chemicals and seal without gaps.

Solution

A three-coat epoxy phenolic lining: MAKE 613 at 125 µm, MAKE 610 at 125 µm and MAKE 608 at 100 µm, 350 µm in total over SSPC SP 5/10.

Result

An area of about 14,000 m² was coated in 8 weeks. The thickness of every coat was checked on site before handover.

Coating system specification

The MAKEPaint products for each surface, from primer to finish, with the dry film thickness the application guide sets.

Coating system specification
ProductDFT
Tanks and silosSurface preparation: SSPC SP 5, 10
PrimerMAKE 613Epoxy Phenolic125 µm
FinishMAKE 607High Build Epoxy Primer125 µm
FinishMAKE 608Multipurpose HB Polyamide100 µm
Total dry film thickness350 µm

Project schedule

The stages of the work by week, from the site survey to handover.

  1. Survey and surface tests

    Week 1

    The technical team checks the surface, the exposure and the area on site.

  2. System recommendation

    Weeks 1–2

    The coating system and colors are agreed, with samples and technical data sheets.

  3. Production and delivery

    Weeks 2–3

    The material is made and shipped from the MAKEPaint plant in Cikarang.

  4. Preparation and application

    Weeks 3–7

    The surface is prepared, then primer, intermediate and finish coats go on.

  5. Inspection and handover

    Week 8

    Coat thickness and adhesion are checked before the work is handed over.

Project video

Coating work on site, from surface preparation to the final coat.

Related documents

Brochures and the catalog for the products used on this project.

Have a similar project?

Tell our team about your surface conditions and requirements.

or email sales@makepaint.co.id