Marka Tol Cipularang

Infrastructure · Bandung · 2022

Project overview

Marka Tol Cipularang in Bandung is a MAKEPaint project reference for traffic and road markings.

Location
Bandung
Sector
Infrastructure
Project year
2022
Duration
7 weeks
Area
± 15,500 m²
MAKEPaint products
3 products

Project photos

Photos from the project site, by coated surface.

Roads and car parks1 / 4
Coating applicationRoads and car parks · 2 / 4
Finished surfaceRoads and car parks · 3 / 4
Coat thickness checkRoads and car parks · 4 / 4

Challenge, solution and result

The conditions on site, the coating system chosen, and how the work turned out.

Challenge

Markings must stay visible day and night, resist tyre wear, and dry fast so traffic can reopen soon.

Solution

MAKE Metroline road marking paint, solvent or water based, and MAKE Line thermoplastic for thicker, longer-lasting lines.

Result

An area of about 15,500 m² was coated in 7 weeks. The thickness of every coat was checked on site before handover.

Coating system specification

The MAKEPaint products for each surface, from primer to finish, with the dry film thickness the application guide sets.

Coating system specification
ProductDFT
Roads and car parks
FinishMAKE METROLINE SBMAKE METROLINE SBPer TDS
FinishMAKE METROLINE WBMAKE METROLINE WBPer TDS
FinishMAKE LINE THERMOPLASTICMAKE LINE THERMOPLASTICPer TDS

Project schedule

The stages of the work by week, from the site survey to handover.

  1. Survey and surface tests

    Week 1

    The technical team checks the surface, the exposure and the area on site.

  2. System recommendation

    Weeks 1–2

    The coating system and colors are agreed, with samples and technical data sheets.

  3. Production and delivery

    Weeks 2–3

    The material is made and shipped from the MAKEPaint plant in Cikarang.

  4. Preparation and application

    Weeks 3–6

    The surface is prepared, then primer, intermediate and finish coats go on.

  5. Inspection and handover

    Week 7

    Coat thickness and adhesion are checked before the work is handed over.

Project video

Coating work on site, from surface preparation to the final coat.

Related documents

Brochures and the catalog for the products used on this project.

Have a similar project?

Tell our team about your surface conditions and requirements.

or email sales@makepaint.co.id