Gudang PT Inti Kemas Putra Makmur
Manufacturing · Tangerang · 2021
Project overview
Gudang PT Inti Kemas Putra Makmur in Tangerang is a MAKEPaint project reference for industrial floor surfaces.
- Location
- Tangerang
- Sector
- Manufacturing
- Project year
- 2021
- Duration
- 4 weeks
- Area
- ± 5,500 m²
- Surfaces
- Floors
- MAKEPaint products
- 3 products
Project photos
Photos from the project site, by coated surface.
Challenge, solution and result
The conditions on site, the coating system chosen, and how the work turned out.
Challenge
Production floors carry forklifts and trolleys every day, take oil and chemical spills, and must be easy to clean.
Solution
A self-leveling epoxy floor: ground concrete, MAKE 661-001 P primer at 100 µm, then MAKE 662-100 F at 400 to 500 µm for a flat, hard, easy-to-clean surface.
Result
An area of about 5,500 m² was coated in 4 weeks. The thickness of every coat was checked on site before handover.
Coating system specification
The MAKEPaint products for each surface, from primer to finish, with the dry film thickness the application guide sets.
| Function | Product | DFT |
|---|---|---|
| FloorsSurface preparation: Grinding | ||
| Primer | PrimerMAKE 662-000 PEpoxy Primer Floor Polyamine | Per TDS |
| Finish | FinishMAKE 662-100 FEpoxy Finish Self Leveling | 400–500 µm |
| Finish | FinishMAKE 661-101F NSEpoxy Finish Non Skid | Per TDS |
Project schedule
The stages of the work by week, from the site survey to handover.
Survey and surface tests
Week 1
The technical team checks the surface, the exposure and the area on site.
System recommendation
Weeks 1–2
The coating system and colors are agreed, with samples and technical data sheets.
Production and delivery
Weeks 2–3
The material is made and shipped from the MAKEPaint plant in Cikarang.
Preparation and application
Week 3
The surface is prepared, then primer, intermediate and finish coats go on.
Inspection and handover
Week 4
Coat thickness and adhesion are checked before the work is handed over.
Survey and surface tests
Week 1
The technical team checks the surface, the exposure and the area on site.
System recommendation
Weeks 1–2
The coating system and colors are agreed, with samples and technical data sheets.
Production and delivery
Weeks 2–3
The material is made and shipped from the MAKEPaint plant in Cikarang.
Preparation and application
Week 3
The surface is prepared, then primer, intermediate and finish coats go on.
Inspection and handover
Week 4
Coat thickness and adhesion are checked before the work is handed over.
Project video
Coating work on site, from surface preparation to the final coat.
Related documents
Brochures and the catalog for the products used on this project.

Have a similar project?
Tell our team about your surface conditions and requirements.
or email sales@makepaint.co.id