Fire Protection & Structure Strengthening, PT. Multisrada Arah Sarana
Industrial · Cikarang · 2025
Project overview
Fire Protection & Structure Strengthening, PT. Multisrada Arah Sarana in Cikarang is a MAKEPaint project reference for structural fire protection.
- Location
- Cikarang
- Sector
- Industrial
- Project year
- 2025
- Duration
- 4 weeks
- Area
- ± 2,000 m²
- Surfaces
- Fire protection
- MAKEPaint products
- 2 products
Project photos
Photos from the project site, by coated surface.
Challenge, solution and result
The conditions on site, the coating system chosen, and how the work turned out.
Challenge
A building’s structural steel needs its designed fire resistance time without adding real weight to the structure.
Solution
MAKEFIRE intumescent coating, which swells under heat, at the thickness for the target fire resistance time, sealed with a finish suited to its surroundings.
Result
An area of about 2,000 m² was coated in 4 weeks. The thickness of every coat was checked on site before handover.
Coating system specification
The MAKEPaint products for each surface, from primer to finish, with the dry film thickness the application guide sets.
| Function | Product | DFT |
|---|---|---|
| Fire protection | ||
| Finish | FinishMAKEFIREMAKEFIRE | Per TDS |
| Finish | FinishMAKE 180Fire Protection | Per TDS |
Project schedule
The stages of the work by week, from the site survey to handover.
Survey and surface tests
Week 1
The technical team checks the surface, the exposure and the area on site.
System recommendation
Weeks 1–2
The coating system and colors are agreed, with samples and technical data sheets.
Production and delivery
Weeks 2–3
The material is made and shipped from the MAKEPaint plant in Cikarang.
Preparation and application
Week 3
The surface is prepared, then primer, intermediate and finish coats go on.
Inspection and handover
Week 4
Coat thickness and adhesion are checked before the work is handed over.
Survey and surface tests
Week 1
The technical team checks the surface, the exposure and the area on site.
System recommendation
Weeks 1–2
The coating system and colors are agreed, with samples and technical data sheets.
Production and delivery
Weeks 2–3
The material is made and shipped from the MAKEPaint plant in Cikarang.
Preparation and application
Week 3
The surface is prepared, then primer, intermediate and finish coats go on.
Inspection and handover
Week 4
Coat thickness and adhesion are checked before the work is handed over.
Project video
Coating work on site, from surface preparation to the final coat.
Related documents
Brochures and the catalog for the products used on this project.

Have a similar project?
Tell our team about your surface conditions and requirements.
or email sales@makepaint.co.id