Loading MAKEPaint
Project reference visual for Brimob Tactical Car

Brimob Tactical Car

Automotive and vehicles · DKI Jakarta · 2023

Project overview

Brimob Tactical Car in DKI Jakarta is a MAKEPaint project reference for machinery and vehicle finishes.

Location
DKI Jakarta
Sector
Automotive and vehicles
Project year
2023
Duration
12 weeks
Area
± 2,000 m²
MAKEPaint products
3 products

Project photos

Photos from the project site, by coated surface.

Machinery and vehicles1 / 4
Coating applicationMachinery and vehicles · 2 / 4
Finished surfaceMachinery and vehicles · 3 / 4
Coat thickness checkMachinery and vehicles · 4 / 4

Challenge, solution and result

The conditions on site, the coating system chosen, and how the work turned out.

Challenge

Machinery and vehicles need a glossy, even finish that resists scratches and is done quickly so they can go back to work.

Solution

MAKE 041 and MAKE 091 industrial paints and MS41 refinish, spray applied, for an even, durable finish.

Result

An area of about 2,000 m² was coated in 12 weeks. The thickness of every coat was checked on site before handover.

Coating system specification

The MAKEPaint products for each surface, from primer to finish, with the dry film thickness the application guide sets.

Coating system specification
ProductDFT
Machinery and vehicles
PrimerMAKE 041Epoxy PrimerPer TDS
FinishMAKE 091PolyurethanePer TDS
FinishMAKE MS41MAKE MS41Per TDS

Project schedule

The stages of the work by week, from the site survey to handover.

  1. Survey and surface tests

    Week 1

    The technical team checks the surface, the exposure and the area on site.

  2. System recommendation

    Weeks 1–2

    The coating system and colors are agreed, with samples and technical data sheets.

  3. Production and delivery

    Weeks 2–3

    The material is made and shipped from the MAKEPaint plant in Cikarang.

  4. Preparation and application

    Weeks 3–11

    The surface is prepared, then primer, intermediate and finish coats go on.

  5. Inspection and handover

    Week 12

    Coat thickness and adhesion are checked before the work is handed over.

Project video

Coating work on site, from surface preparation to the final coat.

Related documents

Brochures and the catalog for the products used on this project.

Have a similar project?

Tell our team about your surface conditions and requirements.

or email sales@makepaint.co.id